1. Filter Project Risk by Rating


From the Project ‘Risk Register’ page, scroll to the ‘Risks’ section. Click the ‘Rating’ dropdown menu and then choose the desired Rating to display (Low, Medium, High). To display all ratings, click ‘All’.


If one of the Risk Ratings is NOT displayed in the dropdown options, this means there are NO Risk Items assigned to that specific Rating.