1. Remove a Pipeline Black Out Period
1. To remove a ‘Black Out Period’ within a Portfolio, navigate to the ‘Pipeline’ page by clicking the ‘Pipeline Management’ tab from the left side bar. Once done, go to the Gantt Chart and double click on the ‘+ Black Out’ that you want to remove.
2. Click the ‘Remove from Portfolio’ button to save changes.
The Black Out Period is now deleted in the Pipeline.