1. Update a Pipelined Project within a Scenario


Pipelined Projects can only be edited in a Scenario.


1. In order to update a ‘Pipelined Project’ within a scenario, navigate to the ‘Pipeline’ page by clicking the ‘Pipeline Management’ tab from the left side bar. Once done, click the Scenario tab with the Pipelined Project to be edit.

 

 

2. Scroll to the Gantt Chart and then double click the period of the Pipelined Project as shown below.


 

3. Once you reach the edit section, update the ‘Start’ and the ‘End’ date of the Pipelined Project. Click the ‘Update’ button to save changes.