1. Setup Project Role Responsibility for Time Tracking

 

Click the Project ‘Settings’ tab from the left sidebar of the page. Once done, navigate to the ‘Project Role Responsibilities’ section and then ‘Project: Time Tracking’. Click the dropdown menu to assign a ‘User Role’ with their corresponding access rights to Project Time Tracking:

  • ‘All’ – user can see the ‘All Tracked Time’ button’
  • ‘Individual’ – user can only see the User’s data